Friday, April 13, 2007
Oak Tree Tile Trim Complete
Monday, April 02, 2007
Crawling

My next step is to retouch the pieces that this happened to, take them to get refired and hope for the best. Otherwise, I may be starting all over. This trim tile part of the dining room project has really been a hassle and progress for this is, should I say......"crawling". Here are the pieces that did make it out successfully and I'm pleased with.
Monday, March 26, 2007
In Between Fires
On Sunday, I sanded and cleaned the trim pieces, then I applied the glaze - LOTS of glaze (about 4 coats). Today (Monday), I'll bring them back to Georgies to get glaze fired.
Saturday, March 10, 2007
So Far, So Good
The darker gray trim on the right was formed just last night and is darker because it still contains moisture. The lighter gray on the left was more several days ago and is pretty well thoroughly dry.
For the cap of the trim, I decided to reuse the already formed clay since that didn't warp as bad. I'll make a decision whether it will be useful after I do the bisque fire.
Saturday, March 03, 2007
Warped
This picture just shows a small portion of the several feet of trim I tooled out but after checking it all out tonight, I realized that most, if not all of the clay work I've done is unusable.
There are few reasons for this warping. The biggest cause is that when I was done forming, to move the clay out of the jig, I had to lift on each end of the 20" section. Since it was still wet, it obviously bends. Though it's laid out flat to dry, apparently the clay has good "memory" and tries to go back to that shape it took when it was removed from the jig.
I also think a small part of it has to do with using recycled clay. From the many dry scraps of clay in making the oak tree mural, I added some to a tub along with water and a lot of mixing. The problem was that I don't think the moisture was evenly distributed, leaving drier clumps in the wet clay. This may be why the trim appears bumpy.
Regardless, I have to start all over. I have a new plan in place and tomorrow it's off to buy fresh clay.
Friday, February 09, 2007
It's Like Watching Clay Dry
I have just finished the final making of the trim and here it is, set to dry. Not the most exciting post, I realize, but that is why I choose the title I did. I have a feeling there's going to be some rework. I can even see some mistakes just in this picture, but I'm done with this stage of the dining room remodel for now.Thursday, February 08, 2007
Oak Tree Tile Trim, Part Four
And the third. At this point, the bulk of the extra clay is off, and it's a matter of going over it several times, while spraying it with water to make sure the clay is uniforming distributed and no small cavities exist:Sunday, December 17, 2006
Oak Tree Tile Trim, Part Three
Then I smoothed the surface out, ready to be tooled:

Next picture is running the tool over the clay. I had to do this several times to take small layers off each pass. Tonight was a good learning experience in this little craft, in that you can't take too much off in one pass because the clay will "tear" off. I also found out that keeping it fairly wet decrease the chance of reapplication of clay. If it does tear or if I found a blemish, I would just reapply the clay and start over. But that's no fun. I really dislike rework.
The finished product:

Tonight I was able to make about 90" of the trim in a matter of about an hour and a half. Here are the 4 sections place on the floor to dry out. I placed them against the wood studs to keep the straightness. But wouldn't it be funny if one of the studs was bowed? Hysterical.
Saturday, December 16, 2006
Oak Tree Tile Trim, Part Two
After making the tool that will form the trim's profile, I made a jig that will hold the clay in place, as well as form the back corner:
And a picture of the forming tool IN the jig (this should clear up any fog):
The first trial run:
After letting it dry out a few days, it is firm enough to handle but still slightly wet that modifications can still be easily made. This is same piece on my counter. This practice piece is fairly rough and the final pieces should turn out much smoother as I will put more time into it.
But it works!

Friday, December 15, 2006
Oak Tree Tile Trim, Part One

Saturday, September 23, 2006
Stove Area Lighting

I got the track light Friday afternoon (much earlier than I thought) and I just got done installing the track system tonight. It took about 3 hours or so and was a little tricky getting everything level. When I finally switched on the the light, I was much more impressed that I had thought I'd be.
Here are some other pictures showing the steps along the way....


Tuesday, June 20, 2006
A Lighting Idea

Yesterday, I had an idea of how to light up the oak tree mural. Place track lighting on the hearth floor, aiming up to the tiles. To try it out, I just placed candles to see how the effect would be with shadows etc. Of course, the candles aren't going to justice to what an electric bulb could do. I don't know. I'm slightly inspired.
What do YOU think?
Friday, May 26, 2006
My First Post