| The fixture close up for the clawfoot tub. Also from Signature Hardware. |
| The fixture for the vessel sink is from Belle Forte. |
Remodeling a quaint little farmhouse in Oregon, and getting loads of splinters along the way.
| The fixture close up for the clawfoot tub. Also from Signature Hardware. |
| The fixture for the vessel sink is from Belle Forte. |
![]() |
| Photo credit: Sharon Greenwood |
| Photo credit: Sharon Greenwood |
| The vanity is white carrara marble sitting on a simple black antique cabinet |












For Halloween this year, my costume consisted of a breathe respirator. Not very scary I realize, but helpful in keeping the lead dust out of my system, which could result in a pretty bad scare. As mentioned in previous posts, old wainscoting was found in the demolition of the bathroom and the thought came to utilize the original wainscot rather than buy new. What seemed like a green/environmentally-conscious and inexpensive solution is actually just the opposite. Not only is the lead dust harmful with cutting, but having to remove the extra gobs of paint on the panels is expensive and fairly nasty due to the hardcore paint remover.
On the positive side, the wainscot will have loads of character and can remain in it’s original home.


The long, tedious process of finishing the drywall begins....
The drywall hanging came at a perfect time, since I was off to Colorado for a work trip soon after and Gary could have the house to himself to do his magic on the drywall finish. It’s November 19rd as I post this and the drywall finish still
continues, but it’s looking very good
.
Here is the ceiling, all hung with care (with drywall).
About five hours was spent this Sunday hanging drywall. Starting with the ceiling, we rigged up a 2x4 about 2 inches from the top of the wall for one edge to sit. One person held the other end, while the other person frantically screwed the wall in place (or fetched screws from the ground, or retrieved the dead battery for the drill). It was nearly a Laurel and Hardy episode

.
In order to meet code when I did the attic remodel, sheer panels were install at the corners of the back of the house to meet wind and seismic loads. I had to tear these out with the bathroom remodel, so here we are putting them back in. Gary handled the nail gun part of the project and I did the hand nailing.