Pages

Friday, December 31, 2010

Wires, Wires, Wires!

After running the wires in the lower bathroom, I knew I was in for a massive project with the kitchen due to the amount of dedicated circuits and lighting needs. In my Gantt Chart, I blocked away 10 days, gave myself 16 hours and estimated about $125 in materials. So far, (and I'm still not done) I have taken about 30 hours and spent about $260.

Though the pictures might not show much to you, seeing all the yellow wiring (I used 12 GA for everything regardless of 15A or 20A) really brought the new kitchen closer to reality. I'm having a qualified electrician come check my work prior to covering the walls with drywall. I'll probably do a second check once everything is connected, just to be safe.


Here's a shot of the ceiling boxes. I'm going to have 3 levels of lighting - low nightlight type lighting in cabinets, medium overhead lighting with fixtures from Rejuvenation, and high level task lighting over the counters by means of modern rail lighting hung from old hand hewn rustic beams.


Wiring in the breakfast nook/cove/snug. I'm going to have the outlet halves controlled by switch, so I can have lamps also provide lighting.



The wall boxes for a couple of Rejuvenation sconces


One 3-way switch for the pantry lighting:



The wires on the left are for the low level lighting rope lights that will go at the base of the copper hood. In the middle is wiring for the exhaust liner and the wiring on the right is for the low level and high level light switches:



Wednesday, December 15, 2010

Header and Posts

The theme of the new kitchen is angled more towards a "french country" style so lots of rustic materials will be implemented. The rustic design concepts started with a brick inlay floor with reclaimed full 2x4s, then faux timber beams were added. After the breakfast nook idea was born, there was a need for support of the joists above. It was back to Aurora Mills to find some big beefy timber.

Here are the posts getting sprayed with bleach water to kill the moss that grew on the timbers as they were stored outside:


After speaking with a structural engineer, he guided me to use 4x4s underneath the posts with a concrete block to spread the load since I don't have reinforced concrete in the basement floor. Try not to look at my messy basement, please:



I lucked out with the post location. Check out this tight fit next to the gas line:



I'm no woodworker (as you can see by the direction the chisel is aimed) but I wanted a keyed type fit for the header to sit on the posts. It might be called a "simple mortise & tenon"? Here I am notching out the header:




After nixing the idea of using human strength to support the header while the posts were installed below due to the chance of the header getting away and falling, I rented a drywall jack from my neighbors across the street. Good folks, they are.


The final result. Header and Posts.
It's not that impressive at this point because of all the other lumber around but once the drywall is installed, it will stand out more. I think the contrast from rough and old to clean + crisp makes a killer look



Saturday, December 11, 2010

Kitchen Framing

When I did the bathroom framing back a month or so ago, I did a little framing of the kitchen prematurely. After some plumbing changes and updates, I need to reframe. Here' s a few shots of my make shift plumb bob telling me where to correctly put my plates.



The following picture doesn't give justice to the time spent on this little section. I think it was about 3 hours just in locating, relocating, and notching out for this area.


The finished framing job...
The door on the end is the bathroom entrance, and the wider opening is for the fridge which I'm considering installing early.


Here is the wall between the recently shrunken bedroom and the breakfast nook...


Wednesday, December 01, 2010

Alternate Kitchen Set Up

With the kitchen gutted to the 2x4s, the need for an alternate kitchen and placement of the fridge and microwave and cabinets arose.

What was my dining room, has now become my kitchen...



After two solid days of cooking, the freezer is now stocked with 30 meals. Frozen Famous Barr Onion Soup, Frozen Lasagne, Frozen Stew, Frozen Chili, Pulled Pork, Frozen Ham & Bean Soup, and Frozen Chicken Noodle. I can guarantee that the first meal cooked in the new kitchen with NOT be soup.



What was the newly, somewhat remodeled lower bathroom, is now the dishwasher space...